Modular and connected solutions for large-scale tunnelling projects

Around the world, major infrastructure projects increasingly combine TBM tunnelling and Conventional Tunnelling within a single project environment. As project complexity grows, so does the need for connected systems that provide reliable data across different construction activities and project phases.

VMT supports large-scale tunnelling projects with modular solutions for automated surveying, digitalisation and quality control. By combining digital technologies with practical, jobsite-proven expertise, VMT helps project teams connect processes, data and decision-making across the project.

Tailored systems for complex project requirements

Across the different disciplines of modern tunnelling, VMT provides solutions designed to address specific project challenges: In TBM tunnelling, smart assistance systems and advanced software functions support the automation of navigation processes and provide reliable positioning data throughout the drive. For segment production, integrated quality assurance and logistics modules enable traceable workflows from the precast factory to segment installation in the tunnel.
In conventional tunnelling, automation solutions and real-time data collection help project teams document, analyse and optimise daily operations.
Thanks to its modular architecture, VMT enables customers to select exactly the systems required for their project and expand them as requirements evolve.

From scattered data to a centralised system

One of the key challenges on large infrastructure projects is bringing together information from multiple systems, teams and construction areas. Increasingly, contractors are looking for solutions that centralise these data streams and make them accessible across the project.

Herrenknecht.Connected provides the digital backbone for this approach. The platform combines information from different project areas in a modular environment where data can be visualised and analysed in real time, creating a comprehensive overview of key project parameters.

As part of the ongoing development of Herrenknecht.Connected, VMT continues to expand the platform with new digital tools. One example is 3D.ON, which provides a near real-time three-dimensional visualisation of the tunnelling process. The data-driven 3D view improves intuitive understanding, supports collaboration, enables faster decision-making and facilitates quality control.

A connected approach to modern tunnelling

By combining automated surveying, digital workflows, process monitoring and quality control within a shared digital environment, VMT helps create connected workflows across large-scale tunnelling projects.

The result is greater transparency, consistent data access and a scalable foundation for future automation and digitalisation.